Export limitation and active power control for PV systems
How export limits are enforced technically, from simple fixed caps to dynamic zero-export control loops, and what to check when a limiter is not behaving as expected.
Regulation, grid connection rules, net metering and market design.
The rules that decide whether a technically sound system can be connected and what its exported energy is worth. Grid codes, protection settings, metering arrangements and compensation schemes, treated as engineering constraints rather than politics.
How export limits are enforced technically, from simple fixed caps to dynamic zero-export control loops, and what to check when a limiter is not behaving as expected.
How grid codes translate into the voltage, frequency and trip-time parameters programmed into a PV inverter, and why getting them wrong causes rejected commissioning.
How energy communities and shared solar schemes work under EU RED II/III, including allocation models, legal structures, and typical member economics.
Why wholesale electricity prices turn negative at midday in high-solar grids, how curtailment is dispatched, and what it means for new PV systems.
Since the revised Renewable Energy Directive, most rooftop installations sit under binding permitting deadlines and many are exempt altogether. Knowing which applies is worth more than any hardware choice.
Why your inverter throttles at noon, what a G99 or VDE-AR-N 4105 application actually reviews, and how export limits are enforced.