Skip to content
SLSolar Ledger

Checklist

Grid connection and paperwork

The administrative path. Missing one of these is the most common reason a finished system sits unenergised for weeks.

10 checks

Before installation

At commissioning

After energising

Standards referenced

  • EN 50549-1
  • IEEE 1547

This checklist is a working aid, not a substitute for the standards themselves or for the wiring rules in force where you are installing.

Other checklists