Skip to content
SLSolar Ledger

Checklist

Commissioning and handover tests

The initial verification sequence, in the order the tests should actually be performed, with the record each one produces.

17 checks

Inspection before energising

DC tests

AC tests and function

Handover pack

Standards referenced

  • IEC 62446-1
  • IEC 60364-6

This checklist is a working aid, not a substitute for the standards themselves or for the wiring rules in force where you are installing.

Other checklists