Checklist
Annual inspection
The yearly visit. Twenty minutes of measurement here catches the failures that otherwise show up as a year of quiet under-production.
Visual
Measurement
Records
Standards referenced
- IEC 62446-1
- IEC 62446-3
This checklist is a working aid, not a substitute for the standards themselves or for the wiring rules in force where you are installing.
Other checklists
Pre-installation site survey
Everything to record on the roof and at the board before a design is drawn, so the design does not have to be revised after the scaffold goes up.
DC side installation
Array-side workmanship checks. Most long-run DC faults are made on the day of installation, not years later.
Commissioning and handover tests
The initial verification sequence, in the order the tests should actually be performed, with the record each one produces.
Battery storage installation
Additional checks that apply once a battery is part of the system, on top of the PV commissioning sequence.
Grid connection and paperwork
The administrative path. Missing one of these is the most common reason a finished system sits unenergised for weeks.