Skip to content
SLSolar Ledger

Checklist

DC side installation

Array-side workmanship checks. Most long-run DC faults are made on the day of installation, not years later.

14 checks

Mounting

Cabling

Protection and earthing

Standards referenced

  • IEC 60364-7-712
  • IEC 62548
  • IEC 62930

This checklist is a working aid, not a substitute for the standards themselves or for the wiring rules in force where you are installing.

Other checklists