Skip to content
SLSolar Ledger

Checklist

Battery storage installation

Additional checks that apply once a battery is part of the system, on top of the PV commissioning sequence.

13 checks

Siting

Electrical

Configuration

Standards referenced

  • IEC 62619
  • IEC 62477-1
  • IEC 60364-7-712

This checklist is a working aid, not a substitute for the standards themselves or for the wiring rules in force where you are installing.

Other checklists