Field references
Installation and inspection checklists
6 working checklists covering 88 individual checks, from the first roof visit through to the grid paperwork. Each one tracks your progress in the browser and prints cleanly to a single sheet, so it can be carried onto site or saved as a PDF.
Pre-installation site survey
Everything to record on the roof and at the board before a design is drawn, so the design does not have to be revised after the scaffold goes up.
21 checks · EN 1991-1-3, EN 1991-1-4, IEC 60364-7-712
DC side installation
Array-side workmanship checks. Most long-run DC faults are made on the day of installation, not years later.
14 checks · IEC 60364-7-712, IEC 62548, IEC 62930
Commissioning and handover tests
The initial verification sequence, in the order the tests should actually be performed, with the record each one produces.
17 checks · IEC 62446-1, IEC 60364-6
Battery storage installation
Additional checks that apply once a battery is part of the system, on top of the PV commissioning sequence.
13 checks · IEC 62619, IEC 62477-1, IEC 60364-7-712
Annual inspection
The yearly visit. Twenty minutes of measurement here catches the failures that otherwise show up as a year of quiet under-production.
13 checks · IEC 62446-1, IEC 62446-3
Grid connection and paperwork
The administrative path. Missing one of these is the most common reason a finished system sits unenergised for weeks.
10 checks · EN 50549-1, IEEE 1547